Independent testing & balancing · Since 1992
TAB for complex
mechanical systems.
Air and hydronic testing, adjusting and balancing across Ontario. Measured performance, documented deficiencies and clear reports for project turnover.
Discuss your project
Illustrative installation · Photo credit: robatherm
Experience across demanding projects
All projects
Golden Manor Long Term Care Home
Air & hydronic TAB · Timmins

VIA Rail Toronto Maintenance Centre
Modernization · Air & hydronic TAB · Toronto

North Bay Community Centre
Air & hydronic TAB · North Bay
Further project experience
Full Spectrum Testing, Adjusting, and Balancing Services
Service detailsAir systems balancing
Measure and adjust supply, return and exhaust airflows to project requirements.
Hydronic systems balancing
Test and balance water distribution in heating and cooling systems.
Duct leakage testing
Measure leakage in ductwork against the specified test requirements.
Ultrasonic flow measurement
Measure water flow without opening the pipe or interrupting the system.
Mechanical systems surveys
Document existing HVAC systems, their condition and their operation.
HVAC audits & evaluation
Investigate HVAC performance and provide pre-design audits for consulting engineers.
Quick report turnaround
Our digital workflow keeps field records, deficiencies and reporting together. Reports are prepared promptly following testing and technical review, giving the project team clear results for turnover.
Measured results. Practical findings.
We document system performance against project requirements and flag deficiencies for the contractor and consultant to address.
Air Plus Testing Ltd.
Independent since 1992.
Thousands of projects across Ontario since 1992. Our work spans new construction and retrofit projects in healthcare, research, education, industry and commercial buildings.
Discuss your TAB requirements
Send the drawings, specifications and anticipated site schedule.
